Posted on 23/01/2013 by lagwpadmin Posted in Projects Since the installation of the new tees/greens/approach and fairway system, the Drift are preparing for the next phase to the irrigation system with a “water catchment well” ready to transfer water to a proposed irrigation reservoir.